10:00am-01:00pm
1. Designed and machined spacers for battery box screws (3 hours)
-------------------------------------------------
1. After designing the spacers on Inventor, I went on a hunt for proper stock and found a small bar that had the exact outer diameter I needed. However, I found out that the chuck on the lathe was too small for the piece, so through some trial and error (I did not damage anything) I managed to remove it and put a bigger one in. After the first couple of spacers (which turned out the wrong size), i got the process down pat and was able to finish all 7 screw spacers
April 4, 2008
March 31, 2008
03/31/08 Nicole Rodia
3:45 - 6:00 pm
1. Finished finding parts for motor controller board
2. Future electronics team meeting
3. Prepared for populating motor controller board - using the microscope, where to find solder paste, etc.
1. Finished finding parts for motor controller board
2. Future electronics team meeting
3. Prepared for populating motor controller board - using the microscope, where to find solder paste, etc.
Subscribe to:
Posts (Atom)